Our documentation for tenders to contractors and developers procuring rough, fine and final cleaning ahead of inspection per AB 04 / ABT 06.
The document pack we link to or attach when we submit a tender.
Clear steps and responsibilities through the full contract period.
Structured mobilisation with a clear takeover plan so cleaning runs from day one with no quality dip.
Clear roles and documented follow-up. Same team every time with a traceable log per shift.
Deviations are logged in a system visible to the client. Clear response times by severity.
Structured exit that protects operations even when the contract ends.
Documented work tasks we follow per shift, adapted to the environment.
Removal of construction debris, sweeping, HEPA vacuuming, releasing surfaces for fine cleaning.
Wiping of joinery, windows, glazing, sanitary and kitchen fittings – every surface handled.
Last adjustments, left in move-in condition. Contractor deviations handed over in a protocol.
Checklists we use internally and attach when needed in tenders.
Current regulations and standards underpinning our work.